Contract Notice Detail
This Request was cancelled by the buyer Município de Odemira on 9/21/2021 4:32:49 PM ((UTC) Dublin, Edinburgh, Lisbon, London (Summer Daylight))
Buyer Comments: Por Despacho do Sr. Vice-Presidente foi revogada a Decisão de Contratar nos termos do art.º 80.º do CCP.

Summary Information

Summary Information
1,149,895.53 Euro
 
2217-14/2021 
Empreitada de Construção do Centro de Atividades Ocupacionais de Odemira 
Tendering Phase
Canceled
Empreitada de Construção do Centro de Atividades Ocupacionais de Odemira 
VortalGOV - Open Tender 

Object of the Contract

Object of the Contract
Execution of Works 
Odemira 7630 Beja PORTUGAL  
45214200-2 - Construction work for school buildings
 
 
 

Scheduling

Scheduling
7/20/2021 3:35 PM (UTC +1 hour)
 
7/20/2021 1:00 AM (UTC +1 hour)
 
9/2/2021 5:00 PM (UTC +1 hour)
 

Financial Settings

Financial Settings
Yes 
 
No 
No 

Contract Documents

Contract Documents
Document NameDescriptionDoc Classification
0-ANUNCIO VORTAL.pdf0-ANUNCIO VORTAL.pdfDownload
MAPA DE QUANTIDADES.pdfMAPA DE QUANTIDADES.pdfDownload
1-PROGRAMA DE CONCURSO VORTAL.pdf1-PROGRAMA DE CONCURSO VORTAL.pdfDownload
2-CADERNO DE ENCARGOS VORTAL.pdf2-CADERNO DE ENCARGOS VORTAL.pdfDownload
3-CONDIÇÕES TÉCNICAS ESPECIAIS.pdf3-CONDIÇÕES TÉCNICAS ESPECIAIS.pdfDownload
ARQUITECTURA.zipARQUITECTURA.zipDownload
ESPECIALIDADES.zipESPECIALIDADES.zipDownload
Publicação DR - Cao.pdfPublicação DR - Cao.pdfDownload

Legal, economic, financial and technical information

No 

Questionnaire

Questionnaire
Vision | Vortal
1
Secção
1.1
Articulado da Consulta
#CódigoDescrição QtUnidade
1
1
MOVIMENTOS DE TERRAS / IMPLANTAÇÃO DAS FUNDAÇÕES
1.1
1.1
Movimentação de terras para as fundações previstas (considerando as cotas finais de projeto) e arranjos exteriores incluindo a preparação do talude adjacente ao edifício para colocação de SAAP e UTA's, bem como o talude do muro do edifício contíguo, com recurso a baldes/riper ou outro sistema mecânico. Este trabalho inclui o transporte dos produtos sobrantes a vazadouro autorizado, considerando carga, transporte a qualquer distância, colocação dos produtos em depósito e eventual indemnização a terceiros e todos os procedimentos inerentes de acordo com a legislação em vigor.
1.1.1
1.1.1
Escavação
800
M3
1.1.2
1.1.2
Aterro (com o resultante da escavação - para enchimento da caixa pré pavimento térreo)
450
M3
2
2
ESTRUTURA DE BETÃO
2.1
2.1
BETÃO DE LIMPEZA EM FUNDAÇÕES
2.1.1
2.1.1
Fornecimento e colocação de betão de limpeza de 150kg/m3, com 0.05 m de espessura no fundo das sapatas e das vigas de fundação, incluido todos os trabalhos necessários e complementares à sua boa construção:
2.1.1.1
2.1.1.1
Sapatas (S2;S20;S29)
0.22
M3
2.1.1.2
2.1.1.2
Sapatas (S3;S4;S18;S19;S25;S30;S33)
0.42
M3
2.1.1.3
2.1.1.3
Sapatas (S13;S17;S22;S24;S27;S28)
0.3
M3
2.1.1.4
2.1.1.4
Sapatas (S6;S10)
0.06
M3
2.1.1.5
2.1.1.5
Sapatas (S35)
0.06
M3
2.1.1.6
2.1.1.6
Sapatas (S7,S11)
0.17
M3
2.1.1.7
2.1.1.7
Sapatas (S12;S14)
0.17
M3
2.1.1.8
2.1.1.8
Sapatas (S16;S21)
0.23
M3
2.1.1.9
2.1.1.9
Sapatas (S34;S36)
0.21
M3
2.1.1.10
2.1.1.10
Sapatas (S9)
0.14
M3
2.1.1.11
2.1.1.11
Sapatas (S26,S32)
0.47
M3
2.1.1.12
2.1.1.12
Sapatas (S1)
0.3
M3
2.1.1.13
2.1.1.13
Sapatas (S31)
0.19
M3
2.1.1.14
2.1.1.14
Sapatas (S23)
0.31
M3
2.1.1.15
2.1.1.15
Sapatas (S43)
0.99
M3
2.1.1.16
2.1.1.16
Sapatas (S8)
0.42
M3
2.1.1.17
2.1.1.17
Sapatas (S39)
0.3
M3
2.1.1.18
2.1.1.18
Sapatas (S40)
0.25
M3
2.1.1.19
2.1.1.19
Sapatas (S37)
0.14
M3
2.1.1.20
2.1.1.20
Sapatas (S38)
0.16
M3
2.1.1.21
2.1.1.21
Sapatas (S44)
0.29
M3
2.1.1.22
2.1.1.22
Sapatas (S41)
0.68
M3
2.1.1.23
2.1.1.23
Sapatas (S42)
0.94
M3
2.1.1.24
2.1.1.24
Sapatas (S45)
0.36
M3
2.1.1.25
2.1.1.25
Sapatas (S47)
0.44
M3
2.1.1.26
2.1.1.26
Sapatas (S46)
1.18
M3
2.1.1.27
2.1.1.27
Sapatas (S5;S15)
0.14
M3
2.1.1.28
2.1.1.28
Vigas de fundação (0,4x0,40)
6.48
M3
2.2
2.2
FUNDAÇÕES EM BETÃO
2.2.1
2.2.1
Fornecimento e colocação de betão armado C25/30, vibrado, incluindo armaduras em aço A500 NR SD e cofragens onde necessário, em sapatas de pilares e vigas de fundação, nas dimensões especificadas nos desenhos, incluindo todos os trabalhos inerentes como sejam as impermeabilizações (com emulsão betuminosa, tipo imperkote F ou equivalente), as contenções das terras, entre outros que garantam a sua boa execução.
2.2.1.1
2.2.1.1
Sapatas (S2;S20;S29)
1.73
M3
2.2.1.2
2.2.1.2
Sapatas (S3;S4;S18;S19;S25;S30;S33)
3.39
M3
2.2.1.3
2.2.1.3
Sapatas (S13;S17;S22;S24;S27;S28)
2.4
M3
2.2.1.4
2.2.1.4
Sapatas (S6;S10)
0.45
M3
2.2.1.5
2.2.1.5
Sapatas (S35)
0.48
M3
2.2.1.6
2.2.1.6
Sapatas (S7,S11)
1.52
M3
2.2.1.7
2.2.1.7
Sapatas (S12;S14)
2.03
M3
2.2.1.8
2.2.1.8
Sapatas (S16;S21)
1.8
M3
2.2.1.9
2.2.1.9
Sapatas (S34;S36)
2.55
M3
2.2.1.10
2.2.1.10
Sapatas (S9)
1.73
M3
2.2.1.11
2.2.1.11
Sapatas (S26,S32)
6.55
M3
2.2.1.12
2.2.1.12
Sapatas (S1)
2.96
M3
Totais(Os valores mostrados não incluem IVA)

Há mais artigos. Pode consultar a lista completa através da exportação

Evaluation

Evaluation
Vision | Vortal

Avaliação

Definir modelo de avaliação
Modalidade de avaliação
Método de Avaliação
Divulgar critérios de avaliação

Critérios da Avaliação

1 - Evaluation Rules

Critérios da Avaliação

Descrição
Tipo de Fator*
Peso (%)
1.

Normas de desempate

Definir normas de desempate?

Public Messages

Public Messages
TypeReferenceSubjectDate
8/3/2021 2:38 PM (UTC +1 hour)
Detail